Locating weather…
unstumbled

Maharashtra Approves ₹18,130 Cr Metro 5 Expansion, New Line 5A For Thane-Kalyan-Ulhasnagar

As a part of Metro 5 expansion, the new Line 5A will run from Durgadi to Kalyan and Ulhasnagar. Read on for all the details.

By Yogita ChainaniUpdated on
Mumbai–Navi Mumbai Airport Metro

In a bid to strengthen public transport in Mumbai and its surrounding regions, a meeting of the Cabinet Infrastructure Committee was convened on 22nd April at Mantralaya in Mumbai under the leadership of Chief Minister Devendra Fadnavis. During this meeting, the Chief Minister approved a substantial loan from HUDCO amounting to ₹18,130.55 crore to support the Mumbai Metro Line 5A across its first two phases, as well as to facilitate land acquisition for three significant expressway projects: Nagpur-Gondia, Bhandara-Gadchiroli, and Nagpur-Chandrapur. Additionally, an allocation of ₹1,063 crore was approved for works associated with Phase 2 of the Nashik-Tryambakeshwar Simhastha Kumbh Mela 2027.

When we talk about Mumbai Metro Line 5A, it will span 34.21 km and incorporate 19 stations. Phase 1 will connect Kasarvadavali to Dahisar Check Naka, while Phase 2 will extend from Dahisar Check Naka to Durgadi.

After Metro 5 Expansion, Metro 5 Line Will Have A Total 19 Stations

🔸 CM Devendra Fadnavis chairs the meeting of Cabinet Committee on Infrastructure. DCM Eknath Shinde, Minister Chandrashekhar Bawankule, Minister ShivendraSinh Raje Bhonsle, and senior officials were present.

🔸मुख्यमंत्री देवेंद्र फडणवीस यांच्या अध्यक्षतेखाली मंत्रिमंडळ… pic.twitter.com/HK4Nezao9k

— CMO Maharashtra (@CMOMaharashtra) April 22, 2026

The new Line 5A will run from Durgadi to Kalyan and Ulhasnagar. This project is set to benefit approximately 6.9 million residents in Thane, Bhiwandi, Kalyan, and Ulhasnagar, reducing travel time by 40-50%. Chief Minister Fadnavis has emphasized the need for expedited action with the central government and relevant departments to secure the necessary approvals.

Lines 5 and 5A will work together to form a unified metro system consisting of 19 stations. A key interchange will be established at Durgadi, alongside a double-decker design that merges a flyover with the metro line between Ranjnoli Junction and Durgadi Chowk, aimed at reducing traffic congestion in Bhiwandi.

The project will connect the current Metro Line 4 (from Wadala to Kasarvadavli) with the planned Metro Line 12 (from Kalyan to Taloja) and the existing Central Railway. This will give rail access to important commercial areas, government offices, and notable places in Thane, Bhiwandi, and Kalyan.

Published:
Updated:
Yogita Chainani

About the author

Yogita Chainani

Website Content Head

Yogita Chainani is the website content head for unstumbled and has previously served as the social media head for CurlyTales Middle East. She has collaborated with brands such as PinkVilla, Connector, TopSpots Dubai, Thatscoop, and several other publications in the food and travel space. An avid traveler, Yogita is on a quest to explore the world, one country and city at a time. She studied journalism at IIJNM Bangalore and HR College in Mumbai. With her strong expertise in travel guides,...

Trending News

Travel, food & experiences

Your next great trip starts here.

One email a week: where to eat, where to go, and what has just opened. No round-ups, no affiliate lists.